Installation instruction of the cabinet with leg

 

     

Put up and Handle with care             Enjoin from stepping.

 

1.Pls take care of loading ,all the products must be layed under the instruction,as showing in the picture

 

Accessories of the facet

 

2.Pls send water facet,drainer and other accessories to customer in time.

 

In order to protect the cabinet,

pls lay some foam on the floor

 

3.In order to protect the cabinet ,pls lay some foam on the floor,and place the wrapper at the appointed place after opening the carton.

 

         

Drilling                                                          Put the tumefacient screw

                                                                       into the wall

 

Adhere the cabinet to the wall with screw

 

4.Be sure all the holes are right , drill holes in the wall with 8mm electric drill first ,then put the tumefacient screw into the wall ,and then intall the cabinet by 6*6.5 screw. Put on the silica gel

 

       

Press the basin                                      Be sure that the cabinet and               basin connected well

 

5.Put some silica gel on the side and back panel of the cabinet in uniformity,then fix the basin onto the cabinet,with heavy press on it ,so the cabinet and basin can be connected well.

 

Distinguish the cold and hot
water pipe

 

6.Connect the cold and hot water pipe up to triangle clique,be care of the position of this two water pipe and airproof ring, connect the drainer and downcomer.First,openi infall clique, and water faucet,close drainer switch to check that whether the basin is good or not.Second,colse the faucet,open the drainer switch to check that whether the basin is good or not.

 

           

   Shelf and side panel                          Bottom panel and side panel

 

     

 

7.Put silica gel on the bottom panel ,shelf ,side panel and division panel ,so that to aviod the damage of the cabinet.
At last ,put silica gel on between the side panel and wall ,basin and wall

 

     

Confirm the height of the                Confirm the hole
mirror cabinet

 

 

8.Confirm about the height of the mirror cabinet according to the height of the faucet.
Drill the hole on the wall with 8mm drilling machine,then put the tumefacient screw into the wall , at last ,connect it onto the
wall ,be sure that there must be 1cm interspace to hanging the mirror

 

9.Press the mirror after hanging it to make sure that the mirror fixed well.
Check the insulation of the electrical wire,then connect the electrical wire to the mirror,then check the lamp to be sure that
whether is good or not.Open the cabinet door ,fix the shelf .Adhere two pieces of 2cm two-side glue on to the bottom of the
mirror. All the operation must be process when the electric is turn off.


Copyright © 2006-2010 Hangzhou Oulin Sanitary ware Co., Ltd.
ADD: Dangshan Town, Xiaoshan Distict, 311225 Hangzhou City, Zhejiang Province, P.R.China.
Tel: 0086 571 83867216 Fax: 0086 571 83867226 E-MAIL: sales@hzoulin.com